Before you buy, finance or redevelop a property, you need to know whether there’s contamination under it. You can’t see it from the parking lot. Old fuel tanks, spilled solvents and fill brought in decades ago can sit below the surface, and they can turn into cleanup costs, financing delays or a stalled project once the property is yours.
We find out what’s under a property in two steps. A Phase I Environmental Site Assessment (ESA) looks at the property’s history to find potential sources of contamination and where it could be. A Phase II ESA takes samples to find out whether it actually is contaminated. Here’s how each step works, what moves a property from one to the other, and how we sample soil and groundwater, including with a membrane interface probe (MIP).
Phase I or Phase One? A quick note on names
You’ll see both spellings, and in Ontario they mean slightly different things.
- Phase I and Phase II usually refer to due diligence assessments done to the CSA standards (CSA Z768 for Phase I, CSA Z769 for Phase II). These are what buyers, lenders and landlords typically ask for.
- Phase One and Phase Two are the assessments set out in Reg. 153/04. They’re required when you need a Record of Site Condition (RSC), for example when a property changes to a more sensitive use like industrial to residential. They follow the same idea, with stricter requirements for scope and reporting.
The steps below apply to both. Our one-pager, Which ESA Do You Need?, puts them side by side. Download it here.
Step 1: The Phase I ESA
A Phase I is a desk study and site visit. No samples are taken. Its job is to find out what has happened on and around the property that could have left contamination behind.
A typical Phase I/One includes one or more of the following:
- Records review. Historical aerial photos, fire insurance plans, city directories, property title, past environmental reports, and government databases of spills, storage tanks, waste generators and permits.
- Neighbouring properties. Contamination doesn’t stop at the property line. We look at what’s around the site too, because a former gas station or dry cleaner next door can affect groundwater under your property.
- Site visit. We walk the property and buildings looking for storage tanks, staining, drains, chemical storage, fill areas and anything else that points to a past or current concern.
- We talk to owners, tenants or site staff who know the property’s history.
- We list any potential environmental concerns found and recommend whether further investigation is needed.
For most properties, a Phase I is the right first step. Many come back clean, and the buyer or lender can move ahead with confidence.
What triggers a Phase II ESA
A Phase II is recommended when the Phase I finds a reason to suspect contamination that can only be confirmed by sampling. Common triggers include:
- Fuel storage: a current or former gas station, or underground or above-ground fuel and oil tanks.
- Industrial or commercial use: manufacturing, metal finishing, auto repair, printing or dry cleaning, on the property or close by.
- Fill of unknown quality: soil brought in from elsewhere, often decades ago, with no record of where it came from.
- Spills or staining: reported spills, stained floors or soil, or floor drains and sumps with no clear discharge point.
- Neighbouring sources: a higher-risk use next door or upgradient that could have affected groundwater under the site.
- Lender or transaction requirements: some lenders ask for a Phase II whenever a concern is identified, even a minor one.
A Phase II doesn’t mean a property is contaminated. It means there’s a question only sampling can answer, and it’s far cheaper to answer it before closing than after.
Step 2: How sampling works
The Phase I tells us where to look. The Phase II sampling plan targets those areas: the old tank location, the former service bay, the fill along the back of the lot.
- Drilling boreholes. A drill rig advances boreholes at each area of concern. As we go, we log the soil type and collect samples at regular depths.
- Field screening. We check each soil sample for vapours and look for staining or odours. This helps us pick which samples go to the lab.
- Installing monitoring wells. Where groundwater could be affected, we install monitoring wells in some boreholes. After the wells settle, we return to measure water levels and collect groundwater samples.
- Lab analysis. Samples go to an accredited laboratory and are tested for the contaminants linked to each concern, such as petroleum hydrocarbons, metals or solvents.
- Comparing to standards. We compare results to Ontario’s soil and groundwater standards for the property’s use, and report what was found, where, and what it means for your project.
If results exceed the standards, the next step is usually to define how far the impact extends and plan remediation or risk assessment. If they meet the standards, you have the documentation to move forward.
Seeing contamination in real time: MIP investigations
Boreholes and lab samples tell you what’s at the points you sampled. On sites with fuel or solvent contamination, we can get a much more complete picture with a membrane interface probe (MIP).
A MIP is pushed into the ground with a direct-push rig. Its tip heats the surrounding soil and groundwater, and any volatile organic compounds (VOCs) pass through a thin membrane into a gas line that carries them up to detectors at the surface. The result is a continuous log from the surface down, showing where VOCs are present and roughly how strong they are at every depth the probe passes through.
Why that matters:
- We see the full depth profile, not just the few depths where a sample happened to be taken.
- We find the source faster. Results show up on screen in the field, so we can adjust the next push location the same day.
- Better sample placement. We use MIP results to choose exactly where to drill and sample for lab confirmation, which means fewer wasted boreholes.
- Clearer remediation planning. Knowing the shape and depth of the impact helps size the cleanup and avoid digging more than needed.
MIP is a screening tool for VOCs, such as petroleum hydrocarbons and chlorinated solvents. It doesn’t replace lab samples, and it isn’t used for contaminants like metals. We use it alongside conventional sampling where the site calls for it.
Which assessment do you need?
It depends on why you need it:
- Buying, selling or refinancing? A due diligence Phase I is usually the starting point, followed by a Phase II only if the Phase I finds a concern.
- Changing to a more sensitive use, or the municipality is asking for an RSC? You’ll likely need Phase One and Phase Two ESAs under O. Reg. 153/04. Tell us at the start if you plan to redevelop, so the work can be scoped to count toward an RSC instead of being repeated.
Our free one-pager, Which ESA Do You Need?, compares Phase I and Phase II, and due diligence and RSC assessments, on one page.
How Peritus can help
Peritus Environmental completes Phase I and Phase II ESAs, Phase One and Phase Two ESAs and Records of Site Condition for buyers, lenders, owners and developers across southern Ontario. Our team handles the full process, from records review and site visits to drilling, coordinates MIP investigations, sampling and reporting, so you get clear answers you can act on. [Learn more about our Environmental Site Assessment services.]
Buying, financing or redeveloping a property? Talk to us before you commit. Call 519.594.0018 (Breslau) or 416.479.4462 (Toronto), or contact us online.